● VGRID POWER |Microgrid solutions and core equipment

Case Studies

1.1 MWp PV-storage microgrid on a Maldives resort island

1.1 MWp PV-storage microgrid on a Maldives resort island
ClientResort Island Utility
IndustryIsland microgrid
LocationMaldives
System capacity1.1 MWp / 2.5 MWh

Results

  • 68%Renewable share
  • −64%Diesel use
  • 4.5 yrPayback

Summary: Renewable share reached 68% and diesel use fell 64%.

The resort island has a large day-night load swing and costly diesel generation. The project deploys 1.1 MWp of PV with 2.5 MWh of storage, hybrid inverters and an EMS.

Results

  • Renewable share of 68%
  • Diesel use down 64%
  • Payback of about 4.5 years

More in this section