AEMS100 fast commissioning: from power-up checks to the nine configuration items
The VGRID POWER AEMS100 quick-commissioning guide starts with wiring: verify the 5 V supply of AEMS100 and SP30HBG2, PCS communications, battery-cluster communications and the WiFi/4G module before touching parameters. A missing link makes later configuration pages unreadable. Once the screen returns to the home page, configure the project items one by one and read back the key variables.