On-site installation, wiring and commissioning: cabinet layout, cable sizing, earthing and grid-tied/off-grid acceptance checks.

Technical articles

AEMS100 fast commissioning: from power-up checks to the nine configuration items

The VGRID POWER AEMS100 quick-commissioning guide starts with wiring: verify the 5 V supply of AEMS100 and SP30HBG2, PCS communications, battery-cluster communications and the WiFi/4G module before touching parameters. A missing link makes later configuration pages unreadable. Once the screen returns to the home page, configure the project items one by one and read back the key variables.

AEMS100 battery communication checks: SOC, current sign and cluster management

The easiest step to skip in the AEMS100 guide, and the one that hides the most risk, is returning to the home page to confirm EMS/BMS data: whether SOC matches the BMS backend and whether battery current direction is correct. The guide states that AEMS100 treats discharge as positive and charge as negative, and the EMS strategy depends directly on that sign. A reversed sign makes SOC appear to fall while charging and can start the genset at the wrong time.

Modbus RTU between PCS and EMS: frames, function codes and register partitions

The VGRID POWER event-record and shutdown-waveform protocol governs PCS-to-EMS communication over Modbus RTU or Modbus TCP/IP, covering SP100HC, SP100HC-1, SP110HS and SP110HS-1. The most common integration error is not wiring but reading across register partitions in a single request: the protocol explicitly states that cross-partition reads are not supported.

LEONA-B375K field wiring and acceptance: breakers, SPDs, earthing and EMS links

The LEONA-B375K single-line diagram (V1.0, 2026-10-19) integrates three SP125HCPS converters, a 400 kVA isolation transformer, an STS, DC busbars, the EMS and breakers QF1-QF8 in one IP54 cabinet. Site work is not redesign but checking every breaker number, surge device, earth bar and the four EMS communication paths against the drawing, then verifying sub-20 ms transfer with waveform records.

Microgrid Troubleshooting Checklist

For microgrid troubleshooting, the answer-first conclusion from VGRID POWER is to fix the continuous load profile, the short-time overload factor and the grid strength before choosing a grid-forming