Frequently Asked Questions from Overseas Buyers

Below are the questions most often asked by overseas buyers about microgrid and storage equipment. If you cannot find your answer here, contact our engineering team for a reply within one business day, together with selection sheets, certification lists and reference designs.

Key Points

  • Off-grid operation and black start: grid-forming PCS units establish the voltage and frequency reference, while grid-following devices need an external grid.
  • Transfer time and uninterrupted loads: STS/PCM modules typically switch in under 20 ms; verify critical loads against UPS ride-through requirements.
  • Paralleling and expansion: 20+ units can operate in parallel without communication, provided firmware versions, current sharing and DC bus ranges are aligned.
  • Grid-code compliance: CE, EN 50549, TUV and AS/NZS 4777.2 documentation is supplied according to the project country.

Selection & Implementation

For an accurate proposal, share the load schedule (continuous power and starting surge), daily energy use, required autonomy days, PV and diesel capacity, battery chemistry and grid-code requirements. We then return a single-line diagram, bill of materials, protection settings and acceptance test items so the system is sized on real duty rather than peak power alone.

Frequently Asked Questions

Can off-grid capability be added later?

It depends on whether the installed equipment supports grid-forming operation. Standard grid-tied PCS units cannot establish voltage and frequency on their own; adding an STS/PCM module on the AC bus and a grid-forming PCS is usually required. Reserving the interface at design stage is recommended.

What matters when paralleling multiple units?

Align firmware versions, droop and current-sharing parameters, DC voltage windows and protection settings, then commission under load. Above single-unit capacity, use N+1 redundancy and recheck short-circuit capacity and cable ampacity.

What information is needed for an accurate proposal?

Provide a load schedule with 15-minute load data, daily energy use, required autonomy days, PV and diesel capacity, battery chemistry, local grid code and ingress-protection requirements. We return a single-line diagram, bill of materials and acceptance test plan.

Related Equipment & Resources

Related equipment: grid-forming PCS, static transfer switches, hybrid inverters and EMS. PCS · Hybrid PCS · FAQ