1.2 MWh behind-the-meter storage in Wenzhou Industrial Park
ClientWenzhou Industrial Park
IndustryC&I storage
LocationWenzhou, China
System capacity600 kW / 1.2 MWh
Results
- ¥620kAnnual bill saving
- 2 cycles/dayPeak-valley arbitrage
- −22%Demand reduction
Summary: Two cycles a day save about ¥620k a year and cut peak demand by 22%.
Manufacturers in the park face a wide peak-valley tariff gap. A 600 kW / 1.2 MWh behind-the-meter system now runs two cycles a day, executing peak-valley arbitrage automatically.
Results
- Two charge/discharge cycles per day
- Peak demand reduced by 22%
- About ¥620k saved in annual energy bills
The EMS ties into the park grid, enabling capacity expansion without downtime.