● VGRID POWER |Microgrid solutions and core equipment

Case Studies

1.2 MWh behind-the-meter storage in Wenzhou Industrial Park

1.2 MWh behind-the-meter storage in Wenzhou Industrial Park
ClientWenzhou Industrial Park
IndustryC&I storage
LocationWenzhou, China
System capacity600 kW / 1.2 MWh

Results

  • ¥620kAnnual bill saving
  • 2 cycles/dayPeak-valley arbitrage
  • −22%Demand reduction

Summary: Two cycles a day save about ¥620k a year and cut peak demand by 22%.

Manufacturers in the park face a wide peak-valley tariff gap. A 600 kW / 1.2 MWh behind-the-meter system now runs two cycles a day, executing peak-valley arbitrage automatically.

Results

  • Two charge/discharge cycles per day
  • Peak demand reduced by 22%
  • About ¥620k saved in annual energy bills

The EMS ties into the park grid, enabling capacity expansion without downtime.