● Microgrid core equipment PCS supplier

Case Studies

Maldives Resort Island 1.1 MWp Solar-Storage Microgrid

Maldives Resort Island 1.1 MWp Solar-Storage Microgrid
ClientResort Island Utility
IndustryIsland microgrid
LocationMaldives
System capacity1.1 MWp / 2.5 MWh

Results

  • 68%Renewable share
  • −64%Diesel use
  • 4.5 yrPayback

Summary: Renewable energy share raised to 68%, diesel consumption down 64%.

The resort island's electrical load varies widely between day and night, and the existing diesel generation was costly to run. The project deployed 1.1 MWp of PV and 2.5 MWh of energy storage, together with hybrid inverters and an EMS.

Results

  • Renewable energy share reached 68%
  • Diesel consumption down 64%
  • Payback period of about 4.5 years

More in this section